Known as a well-established operator in Vietnam, Cuu Long JOC has been operating the Petroleum Exploration and Production activities under the Petroleum Contract for Block 15.1 Offshore Vietnam with four discoveries namely Su Tu Den (Black Lion) Oil Field, Su Tu Vang (Golden Lion) Oil Field, Su Tu Trang (White Lion) Gas-Condensate Field and recently Su Tu Nau (Brown Lion) Oil Field.
Su Tu Trang is a turn-key project which was awarded to PTSC M&C in March 2010 by Cuu Long JOC and its scope of work encompasses Engineering, Procurement, Construction, Installation, Hook-up and Commissioning for a 1,400 ton topside, 1,200 ton jacket, 1,000 ton jacket pile, 19.5 km infield pipeline and the additional modification for the existing Su Tu Vang Central Processing Platform.
The detailed design work was completed in November 2011 by Nippon Steel Engineering Company Limited (NSEC) under the supervision of PTSC M&C. Overall project management, procurement and fabrication are carried out and managed by PTSC M&C as part of its turn-key, EPCI contractor’s responsibilities. PTSC M&C is now targeting the finish date of offshore installation campaign to be in early of July 2012.
PTSC M&C successful history in Vietnam, particularly in terms of providing oil and gas onshore/ offshore facilities, goes back in time to over 10 years. Several large EPCI contracts were executed for their prestigious and respectful clients such as Talisman, BP, ConocoPhilips, Petronas, JVPC, Premier Oil, etc. with PTSC M&C commitment to health, safety and quality, and full compliance to ISO 9001-2008, 14001-2004 and OHSAS 18001 – 2007.
At the ceremony, leaders from PTSC M&C placed their emphasis on the fact that with their on-hand capability, PTSC M&C is now confident to approach and absorb more EPCIC projects for the oil and gas industries. Also are they keen on embarking on the world-integration program and getting more effective cooperation with strategic partners all around the globe.