The very tight 29-month schedule of the project has presented many challenges to PTSC in general and PTSC M&C in particular. However, Bien Dong POC and PTSC have been side by side in each and every issue from detailed engineering, procurement, onshore fabrication to offshore installation. The integrated team formed by PTSC and Bien Dong POC have been striving daily in pursuit of work to ensure the smooth and successful project realization, safety, and high quality. Up to 14th June 2012, the project has achieved more than 8 million man-hours without any lost time incidents.